Electrical work and new outlets around staircase




6 of these spaced throughout bedroom and above stairs





One set of light switches will be here by the chimney

(dimmer for 4 bedroom cans, ceiling fan, and staircase lights - all on seperate switches)


The other switch will be at the bottom of stairs



Pipes and water running to the basement in wall behind side door,

they then run across the ceiling on "finished" side of basement.




Electrician spent about half a day getting the electrical lines run through the upstairs and outlets up to code. We will have 4 can lights in the bedroom on a dimmer switch as well as a ceiling fan. There will be 2 can lights over the staircase. In the bathroom there will be a can light/vent fan over the tub/shower as well as 2 sets of vanity lights above each sink.


Plumbers were here again all day running hot/cold water lines for sink and tub as well as running the pipes across the basement to connect to sewer lines.



Tomorrow they will hopfully putting in tub, toilet and getting them set in place.


By the end of the week, we are hoping to see what looks like a bathroom and walls framing around it!!